Perancangan Ulang Tata Letak Fasilitas Produksi Menggunakan Algoritma CORELAP dan CRAFT pada CV CTR

Authors

  • Dony Sastra Danuatmaja Universitas Widyatama
  • Oktavian Endiyansyah Universitas Widyatama
  • Fadly Rizky Dermawan Universitas Widyatama
  • Tiaradia Ihsan Universitas Widyatama

DOI:

https://doi.org/10.55681/sentri.v5i2.5557

Keywords:

CRAFT, CORELAP, Facility Layout, Manufacturing Industry, Material Handling Cost

Abstract

In the Indonesian manufacturing industry, production efficiency is a key factor in improving company competitiveness, as a significant portion of operational costs originates from material handling activities. Inefficient facility layouts often result in long material flow distances, increased processing time, and high material handling costs. This study aims to optimize the facility layout of CV CTR, a manufacturing company producing ropes and threads, which currently experiences inefficient material flow due to improper departmental arrangement. The research applies a combination of the CORELAP (Computerized Relationship Layout Planning) algorithm and the CRAFT (Computerized Relative Allocation of Facilities Technique) method. CORELAP is used to construct an initial layout based on departmental closeness relationships, while CRAFT is employed to refine the layout through iterative department exchanges to minimize material handling costs. The results indicate that the proposed layout reduces the total Material Handling Cost (MHC) from Rp912,346.84 per day to Rp692,819.43 per day, achieving a 24% reduction. This confirms that the integration of CORELAP and CRAFT effectively improves material flow efficiency and reduces operational costs.

Downloads

Download data is not yet available.

References

A. N. Solih, M. Mohammad, and B. Lovian, “Usulan perbaikan tata letak area gudang produksi bahan baku veneer menggunakan metode CRAFT di CN Veneer,” JURITEK: Jurnal Ilmiah Teknik Mesin, Elektro dan Komputer, vol. 5, no. 2, 2025, doi: 10.51903/Juritek.V5i2.5083.

Badewole and A. Oluwasayo, “The optimization of a company facility layout,” 2021, pp. 1–28.

K. Bouramtane, S. Kharraja, J. Riffi, O. El Beqqali, and A. Chraibi, “A comprehensive review of static and dynamic facility layout problems,” Annual Reviews in Control, vol. 58, Sep. 2024, Art. no. 100970, doi: 10.1016/j.arcontrol.2024.100970.

H. Choi et al., “Optimization of the factory layout and production flow using production-simulation-based reinforcement learning,” Machines, vol. 12, no. 6, 2024, doi: 10.3390/machines12060390.

W. Chukwuemeka, “Applicability of facility layout and materials handling management for operational performance of manufacturing companies in Nigeria: A case study,” vol. 6, no. 2, pp. 1–14, 2023.

M. J. D. Firmansyah and E. P. Putri, “Relayout of production layout to reduce material handling costs,” Journal La Multiapp, vol. 6, no. 1, pp. 34–49, 2025, doi: 10.37899/journallamultiapp.v6i1.1818.

G. Goyal and D. S. Verma, “Optimization of plant layout in manufacturing industry,” International Journal of Recent Technology and Engineering, vol. 8, no. 2, pp. 3115–3118, 2019, doi: 10.35940/ijrte.B2679.078219.

A. J. Santoso and H. Murnawan, “Perancangan ulang tata letak area produksi untuk mengurangi biaya material handling di PT. XYZ,” Jurnal Surya Teknika, vol. 12, no. 1, pp. 472–479, 2025.

G. Kovács and S. Kot, “Facility layout redesign for efficiency improvement and cost reduction,” Journal of Applied Mathematics and Computational Mechanics, vol. 16, no. 1, pp. 63–74, 2017, doi: 10.17512/jamcm.2017.1.06.

R. F. Massebali, R. Rottie, and T. Tumewu, “Perancangan ulang tata letak fasilitas produksi bus dengan algoritma CRAFT untuk menurunkan ongkos material handling,” Integrasi: Jurnal Ilmiah Teknik Industri, vol. 4, no. 2, 2020, doi: 10.32502/js.v4i2.2867.

D. Mufti, “Perbaikan tata letak fasilitas dan pola aliran material pada usaha kecil menengah dengan metode triangular flow diagram,” Jurnal Rekayasa Sistem Industri, vol. 12, no. 2, pp. 201–212, 2023, doi: 10.26593/jrsi.v12i2.6183.201-212.

A. Nabila et al., “CRAFT algorithm method for redesign production layout: Case study of PCL Company,” in Proc. 3rd South American Int. Industrial Engineering and Operations Management Conf., 2022, pp. 1580–1590.

A. Padhil et al., “Perancangan ulang tata letak fasilitas produksi menggunakan metode algoritma CRAFT pada PT. Sermani Steel Makassar,” Jurnal Rekayasa Sistem Industri, vol. 7, no. 1, 2021.

A. B. Patria, B. Suhardi, and I. Iftadi, “Perancangan tata letak fasilitas menggunakan algoritma CRAFT untuk meminimasi biaya material handling,” Performa: Media Ilmiah Teknik Industri, vol. 21, no. 2, p. 119, 2022, doi: 10.20961/performa.21.2.53445.

H. R. Arifin et al., “Optimizing layout and material handling cost: A case study of a small and medium-sized enterprise in the food and beverage industry,” 2023, pp. 854–865, doi: 10.46254/bd05.20220257.

J. W. Pangestika et al., “Usulan re-layout tata letak fasilitas produksi menggunakan metode SLP,” JISI: Jurnal Integrasi Sistem Industri, vol. 3, no. 1, 2016, doi: 10.24853/jisi.4.1.pp-pp.

H. A. Y. Dinç and H. Urgancı, “Facility layout improvement in brake pad manufacturing using CRAFT algorithm,” The Journal of Applied Engineering and Agriculture Sciences, vol. 1, no. 1, pp. 27–46, 2024.

K. Y. A. T. Devi and R. Prabowo, “Desain optimal tata letak fasilitas dengan menggunakan metode CORELAP dan algoritma CRAFT,” Jurnal Teknik, vol. 21, no. 2, pp. 208–216, 2023, doi: 10.37031/jt.v21i2.385.

Downloads

Published

2026-02-28

How to Cite

Danuatmaja, D. S., Endiyansyah, O., Dermawan, F. R., & Ihsan, T. (2026). Perancangan Ulang Tata Letak Fasilitas Produksi Menggunakan Algoritma CORELAP dan CRAFT pada CV CTR. SENTRI: Jurnal Riset Ilmiah, 5(2), 2257–2267. https://doi.org/10.55681/sentri.v5i2.5557