[1]
Gultom, C.W. 2022. PERENCANAAN RESIKO DAN KETERLAMBATAN WAKTU PADA PROYEK PEMBANGUNAN GEDUNG (Studi Kasus : Gedung BPJS KCU Jakarta Utara). SENTRI: Jurnal Riset Ilmiah. 1, 3 (Nov. 2022), 775–786. DOI:https://doi.org/10.55681/sentri.v1i3.288.